The Bridge Boys' Home, Jimbolia, Timis County, Romania

Ready to Pour Floor

 

   

Date: Wednesday 17 September 2003

The basement walls needed reinforcing steel and "shuttering" before the walls were poured. Space has been left in the near end for a door and a window. More plastic sheeting was laid around the outside of the walls.

Back to Life in Action Archive (2003).